Products / District cooling engineering console
DC-EC
Design, run and finance a district cooling system in one console
DC-EC simulates a plant hour by hour for a full year, checks the chilled-water network, and appraises the concession. Every study works from the same saved cases.
- Simulated each year
- 8,760 hours
- Studies, from feasibility to deal room
- 5 missions
- Rates and lump sums
- All editable

Replay the plant like a SCADA room
Step through any hour of the year and see what the plant is doing: chiller modules, cooling towers, hydraulics and thermal storage, with six control philosophy modes.
- Plant efficiency in kW/TR, hour by hour
- Network return ΔT degradation, and how storage bridges it
- Thermal storage charge and discharge through the day

See where the head goes
Lay out the network and follow supply and return head along the governing path. Watch pump speed, head and flow respond to the load, with every station checked for unserved cooling.
- Pump head and speed, hour by hour
- The governing ETS, and the excess pressure each PICV absorbs
- A warning when return head exceeds the storage water level and risks overspill

Five missions, one source of physics
Pick the assignment you are working on. Each study links to saved plant cases and a network case, so the numbers agree from the first screen to the final report.
01
Master plan feasibility
Consultant to a master or community developer
Is district cooling better than air-cooled, water-cooled or VRF, and what plot and road corridors must be reserved?
Deliverable
Executive master-plan feasibility report02
Design and scheme review
MEP design consultant or EPC engineer
Is the thermal storage percentage workable all year, and does the annual kW/TR meet the target?
Deliverable
Backed-up design calculations and tender pack03
Expansion assessment
District cooling company or expansion consultant
Can existing plants and pumps absorb the added loads, and what closes the hydraulic deficit?
Deliverable
Capacity and hydraulic expansion report04
Operational benchmark
Plant operator or utility technical director
What kW/TR is physically achievable with this equipment, and how far are the actuals from it?
Deliverable
Efficiency gap and operating-strategy brief05
Concession appraisal
Grantor and concessionaire
What tariff meets the target equity IRR, and how sensitive is it to ramp-up and EFLH?
Deliverable
Transparent concession report
Appraise a concession from the plant up
Operating cost comes from the plant simulation, and capex and lifecycle overhauls sit in the same model, so the financials start from the engineering.
The tariff solver returns the connection fee, capacity charge and consumption charge that meet your target IRR. Test the result against EFLH sensitivity and a ΔT stress case.
- IRR
- project and equity
- DSCR
- by year, with minimum and average
- NPV and payback
- at your discount rate
- Tariff
- solved for a target return
See it in a short tour
Every rate and lump sum can be edited, so you enter your own project figures. DC-EC is a working engineering tool, not a cost estimator.
Built with MHD
DC-EC is built in collaboration with MHD District Cooling Plants Engineering L.L.C., a district cooling and MEP engineering consultancy working across the UAE and GCC.
Try it on your own project